IQL-2) and what protocol for roadside data collection to include. This determines the road map for how the contractor plans to meet the data-quality level specified (i.e. The methodology for assessing the quality of existing data, and a plan for updating data collection required for modelling purposes. Engineering Analysis and Economic Modelling a. There is currently no guidance on where deviations were made from the original plan - further information will be required on this to complete the evaluation. The methodology for analyzing the extent to which the RRP was implemented as planned and documentation of any deviations from original plan. This EDR covers the following research areas: 0. Abstract An economic analysis (HDM-4/RED) and a performance evaluation (maintenance/transport sector work) of the MCC Senegal Roads Rehabilitation Project.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |